Thu. 25.1.2007, 17:00 present: Klempt, Riegler, Lesenechal, Lenoir, Behrens, Van Beelen

TPC measurement was discussed. Decision to first make only vertical C-side movement (4mm down) and then do a survey in order to validate our survey extrapolation strategy and in order to see that we know exactly what we are doing.

After that we have to lift the I-side and horizontally displace the C-side by 3mm.

Decision of final survey accuracy on monday.